An independent E&P company with operations in the Utica Basin needed to improve the efficiency and productivity of its water logistics to support field development and production plans. The operator adopted the Engage Mobilize E-Ticketing solution to achieve significant improvements in operational efficiencies, cost savings and time savings.
After adopting Engage Mobilize, the independent E&P company saw a 20% reduction in cost per ticket. That is an estimated $1.4 million in annual savings. Along with this, they saw a 23% decline in hours per ticket, a reduction in dispatching time, real-time predictive dispatching, and an improved ESG performance and safety profile.
Download Full Case Study
Call us at (720) 575-6695 to learn more, or click here to book a consultation today. You can also connect with our sales team by emailing us at Sales@engage-m.com.